- Turning on the power. The diesel generators are hooked into the charger for the battery banks.
- The central control unit. As of May 2, the batteries were being charged by the diesel generators
- Wiring up the hybrid propane backup units.
- Technician from Xantrex connecting the propane generators to the system
- Three propane generators will provide power-leveling backup if needed.
- One of the CMM 500 generator units.
Once into the tidal generating process, the engineers found out that these generator units were no longer necessary, so they have been removed