Jan 5-7

Jan 5: Cloudy, rain, 10 knots E.  Had a lot of rain water in a short time, there was a lot of standing water.  Some water leaked under the doors into the engine building, down the roof vent in the battery room and the drain on the roof got plugged up.  I worked on the roof drainage and mopped up in the engine building.  Finalized month end report. Foghorn was going off throughout the night.  One sports fishing/recreation vessel.

Chunk was on the island in the morning but left mid day.

raceJan6

Jan 6, in the centre a ring necked sealion is visible, hauled out on South Islands.

Continue reading