A lot of activity was going on today in the reserve. Guy drove out myself and Laura Verhegge and several others to attend to equipment at Race Rocks. Already there was a crew with Kevin of Oceans Network Canada who were reinstalling the CODAR sea surface monitor. This was last commented on in a log on September 28 Also accompanying us was Ed Weibe, of the UVic School of Earth and Ocean Sciences — EOS 110 Labs Vancouver Island School-Based Weather Station Network http://victoriaweather.ca , who monitors the Davis weather station for our weather page on this site and the UVic Schools Weather program. He was there to change the humidity sensor and check on the equipment. Lucinda Leonard was along to take down the GPS earthquake monitoring equipment after its successful deployment for the past week. (See the May 10 log)
- Laura and Lucinda
- Location of second GPS station
- Lucinda Leonard dismantling equipment
- Location of Original GPS marker.
- Laura recording data points
- Second GPS station
The other activity going on was the installation of a CODAR monitor by the crew with Kevin from Oceans Network Canada.
- new antenna
- carrying antenna to installation location
- base for the antenna