Installation of lower section of the piling for tidal energy project Posted on Tuesday,September 26, 2006 by Garry Fletcher The lower part of the piling awaits installation on the deck of the barge The crane hoists it into position. Almost half of it will be sunk in the shaft drilled underground at 20 meters depth Lowering the lower section of the piling into the casing in the drilled shaft hole. Images by Garry Fletcher and Gary Bouman Link to the Tidal Current Energy Project