The lower part of the piling awaits installation on the deck of the barge
The crane hoists it into position. Almost half of it will be sunk in the shaft drilled underground at 20 meters depth
Lowering the lower section of the piling into the casing in the drilled shaft hole.
Images by Garry Fletcher and Gary Bouman