On August 20, 2006 the cable laying boat was deployed to start the process of laying the four electrical cables and a fibre optic cable which will take the energy generated by the turbine to the energy building on Race Rocks.
Photos taken by Mike Slater, Chris Blondeau and Garry Fletcher