Upper Piling Installation for the Tidal Energy Current Project Posted on Thursday,September 28, 2006 by Garry Fletcher Another barge in position to install the top pilingnicode Top piling on deck The bottom end of the top piling The top side of the top piling where the cradle for the turbine will insert Whole view of top piling Top piling being lifted for installation The divers from CanPac spend several dives torquing the bolts . …which attach the upper piling to the lower piling. Chief Engineer Russ Stothers of Clean Current looks on.. Dan and his partner make two quick dives to take advantage of the short slack water time. Images by Gary Bouman, Garry Fletcher and Chris Blondeau